Can a request to a steward become a building?
Turn a request to a steward into a sealed building deed, then check the materials, workers and obstacles that govern the work.
A plain-language request can become a concrete town deed, but the building does not appear merely because the steward understood the sentence. The interpreted order must be sealed, the building must be available, and the town must have the means to carry out the work.
For example, ask for an unlocked building, then inspect the resulting deed on the order sheet. The sheet is the useful record of what was authorized. If the request was interpreted differently from what you meant, correct the proposal before sealing it. The same kind of deed can be entered by hand, which is a useful comparison when judging whether the interpretation captured your intention.
After sealing, look for the actual work or a stated obstruction. A shortage of materials or workers is a town problem to resolve, not evidence that an empty plot was secretly completed. Unfinished one-off deeds are reconsidered as the steward steps; a completed deed remains visible for a time before being removed from the sheet.
Once the deed is on the sheet, follow its status to the work site and stores. A request for a hut is most useful when the town can supply its materials and people can carry out the work; otherwise the pending deed tells you what still needs attention.
For work that repeats, set a standing order instead of issuing the same request on each visit.
Give and check steward orders · Finish and open the building